Skip to content
Project

(Pending review and sign off) Holsworthy Square – Structural Investigations and Walkway Remediation

Client: Origin Housing Group
Project Dates: March 2024 - current
Location: London WC1
Sector: Housing

Structural investigation and remediation strategy for deteriorating walkway slabs, supporting safe access, compliance and long‑term asset management. 

The client

Origin Housing is a London-based housing provider responsible for managing and maintaining a portfolio of residential buildings, including older estates requiring ongoing investment and structural improvement. 

Services provided

The project

FFT was appointed to investigate structural issues affecting external access walkways at Holsworthy Square and develop a coordinated remediation strategy. 

The project involved diagnosing deterioration within concrete walkway slabs and steel supports and designing a solution to ensure safe access for residents while improving long-term performance. 

Our role

We coordinated structural investigations, including specialist testing, to understand the underlying causes of deterioration. 

FFT then developed a detailed repair and strengthening strategy, produced tender documentation and is supporting procurement and delivery, including management of the Section 20 consultation process. 

The challenges

The walkways were in poor condition, with cracking, spalling and evidence of ongoing reinforcement corrosion driven by water ingress, carbonation and high chloride content. 

Testing also identified weaknesses in the original structural arrangement, requiring a solution that addressed both condition and structural performance. 

Works also needed to be delivered while maintaining safe resident access. 

Added value

FFT provided a joined‑up approach from investigation through to design and delivery. By combining structural testing with practical design solutions, we ensured that recommendations were proportionate and buildable. 

The solution avoids unnecessary full replacement by targeting strengthening and repair where appropriate, improving durability while managing cost and disruption. 

The outcome

Origin Housing now has a clear, deliverable strategy to address structural defects within the walkways. 

The project provides a structured route from investigation to construction, supporting safe access, improved asset performance and long‑term maintenance planning.

TBC

TBC TBC

Back to projects